Beyond Microplastics: Implementation of a Two-Stage Removal Process for Microplastics and Chemical Oxygen Demand in Industrial Wastewater Streams

Michael Toni Sturm, Erika Myers, Dennis Schober, Anika Korzin, Katrin Schuhen

Every litre of this factory’s wastewater carried about 48 million plastic fragments . City treatment plants catch much of that, but not all, and what they catch ends up in sewage sludge. So the researchers asked: what if the plastic were pulled out right where it’s made, while it is still concentrated?

of the microplastic removed from the water, by count and by weight, plus 94% of the chemical oxygen demand. Two stages, three sampling points, eight test phases. Follow a batch below.

Untreated

After belt filter

After carbon bed

Tap a red sampling point to see what was taken there.

What 48 million per litre looks like

Before the numbers, look. These are the actual counting filters from one batch (test phase 8, batch 4), photographed under the microscope at the three sampling points.

Microscope images: Sturm et al. 2024, Water 16, 268, Figure 4, CC BY 4.0. Cropped into separate panels; the dilution labels and scale bars are the authors’.

How the particles were counted

Dilute the sample when it is too crowded to count: from 1:100 down to not at all.

Vacuum-filter it onto a white membrane with a printed grid (pores 0.45 µm, 47 mm across).

Photograph five grid squares under the microscope and count every particle by hand. The smallest visible is 5 µm, many times thinner than a hair.

Scale up by the filter’s area, the volume and the dilution to get particles per litre.

The factory only grinds and refines plastics, so the authors treat the particles in this water as microplastics. That is why simple counting and weighing can stand in for chemical plastic analysis here.

Why not leave it to the city plant?

City wastewater treatment plants are thought to remove 80–99% of microplastics. That sounds like plenty, until you multiply it by the volumes involved.

Estimate Each dot is 1% of the 480 billion particles a day the authors estimate this one site would release, assuming about 10 m³ of wastewater a day. The 80–99% range is the one the paper cites for city plants.

Two problems remain even at 99%:

German rules for industrial wastewater set no limit on microplastics, only on total suspended solids. Preventing their release is up to the companies. The authors’ answer is to go upstream : treat the small, concentrated stream at the factory, so the polluter rather than the public carries the cost. They call this “beginning-of-the-pipe” treatment.

Too small for the filter

The belt filter’s polyester fleece has openings of 70–80 µm. Most ground-plastic fragments are smaller than that. So how can a cloth catch them? Try it.

Teaching model The opening size (70–80 µm) is from the paper; the particle sizes and motion are illustrative. In the study the reagent was always dosed: the plant was never run without it.

The trick is to make the particles bigger . Each 250 L batch is stirred into a whirlpool, and a pump adds 200 mL of an organosilane reagent straight into it. Organosilanes are small molecules built around silicon. One end clings to plastic surfaces; the other reacts with water.

The clumps are far bigger than the fleece openings, so the belt carries them off into a bin. Ordinary flocculants, the chemicals used to clump particles in water treatment, struggle here because plastics differ so much in surface chemistry. Organosilanes can be tuned to specific polymer types.

The method had worked before in the lab and in an earlier pilot with city wastewater. This study tests it on industrial wastewater, where the plastic mixture changes with every customer order.

Three rulers, three answers

The clumps are on the belt. Water samples from point 2 go to the lab and get measured three ways. Before you look: how much of each do you think is gone?

Particle count

Mass of solids (TSS)

Chemical oxygen demand (COD)

Why the rulers disagree

COD is a single lab number for “stuff that can be oxidised”. In this wastewater, part of that is the plastic particles themselves. The rest comes from substances dissolved in the water during processing.

Particle share: caught by the belt filter. Dissolved share: passes straight through any filter. It needs a different tool.

That tool is stage 2 : a 250 L column packed with 175 L of granulated activated carbon . Carbon grains are riddled with tiny pores, which gives them an enormous inner surface. Dissolved molecules stick to it (adsorption) while the water seeps past for about 10 minutes.

The target was COD below 1000 mg/L, which the municipal and federal discharge rules require. Meeting it also avoids extra wastewater fees.

Eight different days, one result

The factory grinds whatever its customers order, so the wastewater changed from phase to phase. Particle counts swung about tenfold and COD about ninefold. Did the plant keep up? Pick a ruler and a phase. Your choice also drives the plant at the top.

≈ from figures Phase bars are read from the paper’s Figures 3, 5 and 6. The percentages are the labels printed on them, which average over batches, so they need not equal the ratio of the averaged bars. Means and ± are from the text. Particle counts after the carbon bed could not be measured: the carbon sheds fine grains of its own.

Figure 3: particle count per litre, untreated and after the belt filter.

Figure 5: total suspended solids (mg/L) at the three sampling points.

Figure 6: COD (mg/L) at the three sampling points.

Sturm et al. 2024, Water 16, 268, Figures 3, 5, 6, CC BY 4.0 (unmodified apart from resizing).

A cheaper ruler: shine a light

Counting particles by hand and weighing dried filters take hours. Turbidity , how much a beam of light is scattered by the water, takes seconds and can even be measured continuously by a sensor. Can it stand in for the slow measurements?

NTU (nephelometric turbidity units) is the standard turbidity scale; higher means cloudier. Beam brightness here is drawn from those mean values.

Which lab measurements could a turbidity sensor replace?

Select every one you think tracks turbidity closely.

Pick one or more to see how closely each moved with turbidity across all samples.

Sturm et al. 2024, Figure 7, CC BY 4.0 (resized). Numbers are Pearson correlation coefficients: 1 is a perfect straight-line relationship, 0 none.

Where did the plastic go?

“Removed” describes the water, not the plastic. Follow the mass of solids through the plant and watch where it leaves the measured water stream.

From measured means Arithmetic on total suspended solids: 1068 → 58 → 16.3 mg/L, i.e. grams per m³. These are dry masses of solids, presumed by the authors to be mainly microplastics; they don’t include the reagent or the water in the clumps. Estimate The day and year views use the paper’s assumptions of about 10 m³ a day and 250 working days.

Removed from the water is not the same as destroyed.

What changes is where the plastic ends up. It no longer travels in a dilute stream through the sewer to a city plant and its sludge. It is collected as clumps at the factory gate.

Why catch it while it’s crowded?

The same organosilane method was tried earlier on the outflow of a city treatment plant. It removed far less there. To see one reason why, change how crowded the water is.

Clumping only works if coated particles meet . In crowded water they bump into each other constantly. In dilute water each particle may circle the tank for a long time without finding a partner.

Measured The earlier pilot (Sturm et al., Water 2023) treated the outflow of a city plant’s third cleaning stage. The authors attribute its lower removal to the low concentration, which makes particles harder to locate and collect into clumps. The setups also differed: that plant ran continuously and skimmed the clumps off the surface, while this one used batches and a belt filter.

So the source is not just where the responsibility lies. It is also where the plastic is most crowded, and therefore easiest to catch. Treating a small, concentrated stream also means far less water to process than at a city plant.

What if the plastic never left the factory?

Over three months and eight test phases of very different wastewater, the two-stage plant took most of the plastic out of the water at the source, before any of it reached the sewer.

What it brings closer, in the authors’ view

Treatment at the source, paid for by the polluter instead of the public.

An easier job for the city plant, with less plastic and less COD arriving.

Process water clean enough to reuse, even for irrigation where water is scarce.

Cheap turbidity sensors to steer reagent dosing and carbon contact time.

What remains open

The plastic is collected, not destroyed. What becomes of the agglomerates lies outside the study.

Only 8 m³ passed the carbon bed, so its capacity and regeneration need longer runs.

Particle counts after the carbon bed could not be measured because of carbon dust.

The ≈2.7 t a year is an extrapolation, assuming about 10 m³ of wastewater a day and 250 working days.

The research paper

Sturm, M.T.; Myers, E.; Schober, D.; Korzin, A.; Schuhen, K. Beyond Microplastics: Implementation of a Two-Stage Removal Process for Microplastics and Chemical Oxygen Demand in Industrial Wastewater Streams. Water 2024 , 16, 268. https://doi.org/10.3390/w16020268

Open access under CC BY 4.0. Published 12 January 2024. Authors’ affiliations: Wasser 3.0 gGmbH, Karlsruhe, Germany; D. Schober also abcr GmbH, Karlsruhe. The pilot plant uses the Wasser 3.0 PE-X® technology and was operated on-site at a plastics grinding and refining company in Germany. Raw data for all phases and batches are in the paper’s Supplementary Table S1.

Funding as stated in the paper: co-funded by the European Union’s HORIZON EUROPE innovation programme (grant agreements 101093964 and 101112877) and by the Veolia Foundation (Germany), project konti|detect. The authors thank abcr GmbH for project-related support.

Figures reused in this companion: Figure 4 (microscope images, cropped into panels), Figures 3, 5, 6 and 7 (resized), all CC BY 4.0, © 2024 the authors. The animated plant is a schematic redrawn from the paper’s Figure 1. Per-phase values marked ≈ were read from the published figures. The sieve and crowding simulations are illustrative teaching models, not results from the paper.

Topics in this iPaper

Earth & environment
The overall goal is to prevent microplastics from entering the wastewater system and reduce the COD load

Section 1 Introduction, page 3

Engineering
This paper presents a pilot-scale plant study for the removal of MP and COD from industrial wastewater

Abstract, page 1

Chemistry
subsequently chemically fix the agglomerates in a water-induced sol–gel process

Section 4.1, page 10

microplastics
The results showed an average decrease in MP by 98.26 ± 2.15% measured by TSSs

Abstract, page 1

industrial wastewater treatment
removal of microplastics and the chemical oxygen demand (COD) from the wastewater of an industrial plastics processor

Section 1 Introduction, page 3

chemical oxygen demand
Thus, the average reduction was 94.3 ± 8.9% with a minimum of 65.3% and a maximum of 99.9% COD removal.

Section 3.4, page 8

organosilanes
The microplastic removal is based on the physicochemical agglomeration fixation of microplastics from waters by organosilanes

Section 1 Introduction, page 3

activated carbon adsorption
pumped through a 250 L fixed bed reactor containing 175 L granulated activated carbon (GAC)

Section 2.1, page 4

turbidity
Thus, turbidity is a possible parameter for process control with little effort required for the measurements.

Section 3.6, page 10